Gharib Gulf Oil Services
Documented Experience Since 2005

Well Testing &
Production Support

Complete test-separator packages, manifolds, pumps, tanks, oil/gas/water measurement, pressure and temperature monitoring, and production reporting. Documented experience across West Bakr and Red Sea fields since 2005.

2005
First Well Test Contract
8+
Well Testing Contracts
5
West Bakr Engagements
3
EPCC Separator Projects

Service Scope

From test separator to production report — an integrated package for well testing and field production support.

Test-Separator Packages

Two-phase and three-phase horizontal separators designed for the full range of gas/oil ratios. On-skid packages include separator vessel, instrumentation, control devices, piping, hoses and fittings for safe and continuous operation.

Manifolds

Design, fabrication and installation of production manifolds. Gharib Gulf has fabricated 6-slot manifolds for Petroleum Development Services (PDS) to full API standard, including RT, PT, hydrotesting, sandblasting and painting.

Pumps & Transfer Systems

Supply, installation and maintenance of transfer pumps as part of well testing and early production facility packages. Pump sizing is determined by operating data and production volume requirements.

Storage Tanks

Fabrication of storage tanks to API standard. Scope includes detailed engineering, WPS & PQR, NDE/NDT procedures (VT, RT, PT), hydrotesting, sandblasting, painting and full documentation. Gharib Gulf has fabricated stock tanks for Petroleum Development Services (PDS) at Ras Gharib Yard.

Field Operation & Maintenance

On-site operation and maintenance of well testing packages on a rental/call-out basis. Services include separator maintenance, SDV and PSV maintenance, instrument calibration, and full commissioning and start-up support.

Oil / Gas / Water Measurement

Liquid and gas flow meters supplied and installed on test separators. Oil production tracked via hourly tank gauge readings (barrels). Gas flow calculated using orifice differential pressure: Q = C × hw × P_static. Water production monitored through three-phase separation instrumentation.

Pressure & Temperature Monitoring

Hourly monitoring of separator pressure (PSI) and manifold pressure (PSI) alongside separator and manifold temperatures (°F). Instrumentation includes PSHH, PSLL, LG, LIC, PCVs, LCVs, level switches and local shutdown panels (SDP).

Production Calculations & Reporting

Structured well test reports capturing hourly data: orifice size, oil reading (barrels), separator and manifold temperature and pressure. Gas calculation section includes C constant (from lab analysis), differential pressure hw, static pressure, and computed daily flow rate (SCFD). Bilingual reporting available.

Early Production Facilities

Complete EPF Packages

Gharib Gulf delivers complete Early Production Facility packages from system calculations and selection through installation, commissioning and maintenance. Process flow: Wellhead → Indirect Heater → 3-Phase Separator → Crude Export Pumps → Loading & Shipping Line.

Scope 2 — Low Water / Heating Required

For fields with low water production where heating is needed to meet pour point and shipping specifications.

  • 2 × Indirect Heaters
  • 2 × Production Separators
  • 4 × 1,000 bbl Storage Tanks
  • 5 × Transfer Pumps
  • 2 × Chemical Injection Skids

Scope 3 — Full Commercial Production

For fields at full production capacity with commercial water production requiring complete treatment and export systems.

  • 2 × Production Separators
  • 1 × Indirect Heater
  • 1 × Heat Exchanger
  • 4 × 1,000 bbl Storage Tanks
  • 2 × Chemical Injection Skids
  • 1 × API Skimmer
  • 5 × Pumps
  • 1 × Vertical Knock-Out Drum

Complete Package Main Equipment

Manifold
Indirect Heater (optional)
Production Separators
Desalters (optional)
Heater Treater (optional)
Flare KO Drum (optional)
Shipping Tanks
Transfer Pumps
Documented Contract Record

Documented Field Experience

All contracts and projects listed below are sourced from Gharib Gulf's official contracts and projects history (2001–2021). No fabricated figures, clients or certifications.

2007 – 2010West Bakr Petroleum CompanyWest Bakr Fields, Red Sea, Egypt

Well Testing Package — Rental / Call-out basis. K-field and H-field operations. Documented well test data includes Well H-2 (16 Jan 2007): oil production tracked hourly from 10,146 to 10,384 barrels; gas flow rate calculated at 5,942 SCFD using orifice differential pressure method.

2010West Bakr Petroleum CompanyWest Bakr Fields, Red Sea, Egypt

Routine and Non-Routine Valves Maintenance (Onshore) — supporting production continuity across West Bakr field infrastructure.

2011West Bakr Petroleum CompanyWest Bakr Fields, Red Sea, Egypt

Well Testing Package — Rental / Call-out basis. Continued field support under framework contract.

2013West Bakr Petroleum CompanyWest Bakr Fields, Red Sea, Egypt

Well Testing Package — Rental / Call-out basis. Third well testing contract with West Bakr, confirming long-term operational relationship.

2016West Bakr Petroleum CompanyWest Bakr Fields, Red Sea, Egypt

Routine and Non-Routine Valves Maintenance (Onshore) — continued wellhead and valve integrity support.

Well Test Report Format

Derived from actual Well H-2 test data, West Bakr Field, 16 January 2007.

Hourly Data — Well H-2, 1/4" Orifice

TimeOil Reading (bbl)Sep. Press. (PSI)Manifold Press. (PSI)
08:0010,1464N/A
10:0010,1988N/A
12:0010,24812N/A
14:0010,29815N/A
16:0010,33818N/A
18:0010,36816N/A
20:0010,38414N/A

Gas Calculation — Well H-2

FormulaQ = C × hw × P_static
C (from gas lab analysis @ 69.4°F)26.89
hw (differential pressure)3.175
P_static2.9
Q (SCFH)247.590
Average Daily Gas Flow Rate5,942.152 SCFD

Gas sample received 17 January 2007.

Need Well Testing or Production Support?

Contact our team to discuss your well testing package requirements, early production facility needs, or separator support.